Skip to Main Content
  • Linde Worldwide
  • The Linde Group
  • About Linde
  • Engineering
    New Zealand

  • Welcome
  • About Linde Engineering
      • Management
        • Dr Christian Bruch
        • Juergen Nowicki
        • John van der Velden
        • Tilman Weide
      • Locations
        • Linde Engineering Dresden
        • Linde Engineering Schalchen Plant
        • Selas-Linde GmbH
        • Linde Kryotechnik AG
        • Cryo AB
        • Cryostar SAS
        • Linde CryoPlants Ltd.
        • Moscow Representative Office
        • Linde Engineering Rus, OOO
        • Linde Engineering North America Inc. - Tulsa, Oklahoma
        • Selas Linde North America
        • Hydro-Chem
        • Linde Engineering North America Inc. - Houston Office
        • Linde Engineering (Hangzhou) Co., Ltd.
        • Linde Engineering (Dalian) Co., Ltd.
        • Beijing Representative Office
        • Linde Arabian Contracting Co. Ltd.
        • Linde Engineering Middle East LLC
        • Linde Engineering Korea
        • Linde Engineering South Africa (Pty) Ltd.
      • Quality, Health, Safety & Environment (QHSE)
        • QHSE at construction sites
        • Certificates and awards
      • Collaborate.Innovate.Deliver.
        • Collaborate
          • Kickoff for mega project
          • Collaborate - Teaming up for success.
          • Providing efficient plant solutions for hydrogen gas
          • Cooperating for record recoveries
          • Producing LNG in the Arctic
          • Teaming up for optimum outcomes
          • Rescue plan for refinery
          • Teaming up for petrochemical projects
          • Coaching on construction sites
        • Innovate.
          • Recycling CO₂– the efficient way
          • The CO2-tolerant plant
          • Mid-scale is scaling out
          • The key to success
          • Hybrid process to recover helium
          • A virtual tour of Amur
          • 3D metal printing in plant engineering
          • Managing heat efficiently
          • New opportunities for CCS technology
          • Modular knows no limits
          • Making low-volume on-site hydrogen viable
          • Virtual plant training
          • New all-round service for your plant
        • Deliver.
          • Powerful solutions for extreme conditions
          • High-quality paper thanks to oxygen
          • Ecosourcing raw CO₂
          • Supplying liquefied natural gas
          • Oxygen for mega GTL and CTL plants
          • Engineering defies permafrost
          • All-in-one package destined for Australia
          • Safety around oxygen
        • The mega refinery
  • Process Plants
      • Air separation plants
        • Customised air separation plants
        • Modular air separation plants
        • Containerised air separation plants
        • References
      • LNG and natural gas processing plants
        • Liquefied natural gas (LNG)
          • World-scale LNG plants
          • Floating LNG production and storage
          • Small to mid-scale LNG plants
          • StarLNGL™
          • LNG terminals
          • Flat-bottom storage tanks
          • LNG fuelling stations
        • Natural gas liquids (NGL)
          • CRYO-PLUS™
          • NGL and LPG recovery
        • Nitrogen rejection
        • Helium recovery and liquefaction
        • References
      • Hydrogen and synthesis gas plants
        • Gas products
          • Hydrogen
          • Carbon monoxide
          • Synthesis gas
          • Ammonia
          • Methanol
        • Gas generation
          • Steam reforming
          • Partial oxidation
          • Tandem reforming
          • CO shift conversion
          • Isothermal reactor
        • Gas processing plants
          • Partial condensation process and liquid methane wash
          • Liquid nitrogen wash
          • Separation of hydrogen and LPG from refinery fuel gas
          • Rare gas processing
          • Acid gas removal and sulfur recovery
          • RECTISOL® wash
          • Purge gas recovery
            • Purge gas recovery. Your individual needs.
      • Petrochemical plants
        • Acetylene recovery technology
        • Steamcracking technology
          • Cracking furnace technology
          • Ethylene separation technology
        • Linear alpha olefins (LAOs)
          • α-SABLIN® technology
          • Recovering linear alpha olefins (LAOs)
        • Polyolefin plants
          • Polyethylene plants
          • Polypropylene plants
        • Third-party technologies
          • Aromatics plants
          • Petrochemical plants
          • Refineries
        • Oxidative coupling of methane (OCM)
        • References
      • Adsorption and membrane plants
        • Membrane plants
        • Hydrogen recovery and purification
        • Oxygen generator plants
        • Nitrogen generation
        • Carbon dioxide removal and purification
      • Cryogenic plants
        • Helium liquefiers
        • Helium refrigeration plants
        • Hydrogen liquefiers
        • Helium recovery systems
        • Equipment and accessories
      • CCS and CO₂ plants
        • CCS plants
          • Post-combustion
          • Pre-combustion
          • Oxy-fuel combustion
          • CO₂ storage
        • CO₂ plants
          • CO₂ removal stand-alone plants
          • CO₂ purification and liquefaction
            • Customised CO₂ plants
            • Modular LCO₂ plants
            • CO₂ purification and liquefaction questionnaire
      • Furnaces, fired heaters and incinerators
        • Steam reformer furnaces
          • HYDROPRIME® hydrogen generators using steam-methane reforming
        • Cracking furnaces for ethylene production
        • Cryogenic vaporiser
        • Fired heaters and waste heat recovery units
          • Process heat transfer
        • DRI heaters & special crackers
        • Incinerators and thermal oxidisers
          • Incinerators for gaseous and non-aqueous liquid wastes
          • Incinerators for aqueous waste streams
          • Flameless thermal oxidisers
  • Plant Components
      • Plate-fin heat exchangers (PFHEs)
        • Plate-fin heat exchangers – Design variants
      • Packaged units / coldboxes
      • Cryogenic columns
      • Coil-wound heat exchangers (CWHEs)
      • Cryogenic tanks
        • Customer Information Centre
      • Air-heated vaporisers
      • Water bath vaporisers
      • Spiral-welded aluminium pipes
      • Helium storage tanks
      • UN portable tank (Helicon)
      • Operational services
  • Services
      • LINDE PLANTSERV™
        • Contact
        • Plant modification and revamp
        • Spare part management
        • Maintenance and repair
        • Training
        • Support on plant operations
        • Case studies
          • Case study. Plant modification.
          • Case study. Spare part management.
          • Case study. Maintenance and repair.
          • Case study. Training.
          • Case study. Support on plant operations.
      • Engineering
        • Modularisation
      • Procurement
        • Supplier portal
          • Conditions of purchase
          • Linde Standards for suppliers
          • eAuctions
      • Construction
      • Export and project financing
  • Innovations
      • Virtual reality redefines plant engineering
      • Linde Pilot Reformer
      • Green hydrogen from biomass
      • Rare gas units
      • α-SABLIN® – Oligomerisation of ethylene to linear α-olefins (LAOs)
      • Compact membrane reformer for hydrogen production
      • Heat exchangers for floating LNG (FLNG) plants
  • News & Media
      • Press Services
        • Interview Digitalisation
      • Press Releases
      • Linde @ Social Media
        • Facebook
        • Twitter
        • YouTube
        • Google+
        • LinkedIn
        • Miscellaneous
        • Social Media Guidelines
      • Events
        • Gastech 2018
        • Achema 2018
        • Nitrogen + Syngas 2018
        • Events Archive
          • The 10ᵗʰ Hydrogen and Syngas Symposium
            • Agenda
            • Videos
          • Gastech 2017
          • Achema 2015
            • Discover
            • Engage
            • Experience
            • Stack up
            • Network
          • Downstream Tatarstan
      • Publications
      • Linde Apps
        • Investor Relations App
        • BeeZero App
        • C-Pot
        • Gas Converter
        • Gas distribution partner-search
        • Fascinating Gases
        • Virtual World
        • Virtual Cryo
        • BOC re-order
        • Afrox Shop
      • Image Library
      • Video Library
      • Media Contacts
  • Careers
      • Work @ Linde
      • People @ Linde
        • License to Fill
        • Matthias & the Mechanics
        • The Caring Side (DO NO USE)
        • The Pathfinder
        • Giving Back
      • Roles @ Linde
        • Engineers & Technicians
        • Sales & Customer Service
        • Healthcare & Homecare
        • Corporate Functional Staff & Admins
        • Operational Staff, Fillers & Drivers
      • Jobs @ Linde
        • Locations worldwide
      • Students & Graduates
        • School Students
        • University Students
        • Graduates
      • Apply @ Linde
      • Job Blog
        • A Dream Job
        • A New Home
        • Insider Tips
        • Shell Eco-marathon
        • Shell Eco-marathon London
        • Shell Eco-marathon: Driving change
        • A whole new weld
        • Mission: Impossible
        • Into the future: at the push of a button
  • Contact & Support
      • Contact
      • Route Planner
  •  
  • Linde Worldwide
  • The Linde Group
  • About Linde
  • About Linde Engineering
  • Collaborate.Innovate.Deliver.
  • Deliver.
  • All-in-one package destined for Australia
This image is a ready-made PNG file. It is intended for the use of the collaborate innovate deliver website – and is not suitable for any other purpose. The pictures used are ID 100806.

Shipped ready-to-runOne-stop solution for nitrogen removal

In some projects, teamwork can literally be expressed in units of measurement. Like when you’re building a 900-tonne module. This mammoth component was the result of intense and collaborative development work, overseen by Linde project manager Dr Luis Grimm. He and his team of specialists had to overcome enormous technical and organisational challenges before shipping their nitrogen removal unit (NRU) to its final destination. “We started out with a simple process diagram three years ago,” explains Luis Grimm. “But we knew that we had an extremely complex task ahead of us.” The Linde experts could only achieve their ambitious goal through close collaboration.


Increasing the value of natural gas as a fuel

It all started back in 2013, when Linde Engineering was commissioned to build an NRU for a customer in Western Australia. The unit was to be integrated into one of the country’s largest natural gas plants, where it would be used to increase the calorific value of natural gas so that it could be fed into the local supply grid.

As a one-stop provider, Linde was responsible for the entire process – from planning through the procurement of all parts to module assembly. “Very few companies worldwide can offer a one-stop service for a complex project on this scale,” explains engineering manager Andreas Behrendt. “We have the technical know-how coupled with the engineering and procurement excellence to overcome all the logistical and organisational hurdles involved in a full-service package such as this.”

The project also presented its own cost challenges. Building the unit in Australia would have pushed costs up significantly. As a result, the unit was to be modularised and assembled in Europe. It would then be shipped practically “ready to run” to Australia. Linde decided to assemble the unit in the Spanish port of Tarragona, opting for a modular approach from the get-go. The assembly of the four NRU modules was overseen by the Linde site in Schalchen, Germany.


Process animation of removing nitrogen from natural gas


The process of removing nitrogen from natural gas

The NRU functions in the following way: The incoming nitrogen-methane mixture is initially pre-cooled to minus 18 degrees Celsius in the first module, the dew point control skid, using plate-fin heat exchangers from Linde. Heavy hydrocarbons are separated through condensation. The nitrogen-methane mixture is then cooled further to minus 186 degrees Celsius in the second module, the coldbox. The components in the mixture can be cryogenically separated in this way because nitrogen and methane condense at different temperatures. The unit vents the nitrogen to the atmosphere while the methane is fed into one of the two pump modules, where it is compressed to different pressures for different applications.

“The coldbox is at the heart of the unit, weighing 350 tonnes and measuring 35 metres,” says Luis Grimm. “It is an extremely complex module and you can’t simply buy it off-the-shelf for an application like this”. The entire unit had to be planned specifically for the conditions in Australia, as Andreas Behrendt explains: “The composition of the natural gas, for example, is different for every project. And it also changes during the lifecycle of the entire unit”. As a result, Linde’s engineers had to factor in a number of different potential scenarios. “Our NRU is designed for different operational conditions. This makes it extremely flexible”.

Nitrogen rejection unit (NRU) model fabrication at Tarragona, Spain

Nitrogen rejection unit (NRU) model fabrication at Tarragona, Spain


140,000 working hours for assembly

“Coordination was one of the biggest challenges,” adds Grimm. Linde Engineering, however, has decades of experience with complex projects, designing many different unit components and coordinating procurement to ensure each one is available on the construction site – precisely when it is needed. The assembly process was subject to stringent test and safety regulations. In the end, engineers worked 60,000 hours on the project. A further 140,000 hours were needed to assemble the unit in Tarragona.

The customer benefitted from Linde’s all-round package, spanning design, procurement and delivery. “The benefits of a modular design can be summarised in four categories,” explains Ralf Bellaire, Head of Engineering at Linde Engineering. “Number one, reducing construction cost; number two, reducing the construction schedule; number three, minimising the risk exposure; and number four, increasing the quality”.

  • About Linde Engineering
  • Collaborate.Innovate.Deliver.
  • Collaborate.
  • Innovate.
  • Deliver.
Any questions or comments?
Contact us
Technical deep dive
  • Optimum separation of nitrogen
More information
  • Liquefied natural gas (LNG)
  • Natural gas liquids (NGL)
  • Nitrogen rejection
  • Helium recovery and liquefaction
  • References
    •  
    • Sitemap
    • Terms of Use
    • Legal Notice
    • Data Protection
  • © The Linde Group 2018

To enhance your user experience and to deliver our online services, this website uses cookies for reasons of functionality, comfort and statistics. By continuing to browse the site, you are agreeing to our use of cookies.
You can find out more on our data protection information.
You must check the "I accept cookies from Linde Sites" box to accept.
More